Setpoint RTU Solution by MOBACT

Setpoint Remote Control solution for PV parks in compliance with HEDNO requirements

Solpoint – The ultimate RTU solution for remote monitoring from MOBACT

Managing and monitoring energy facilities requires sophisticated telemetry solutions that can ensure reliable operation, maximum efficiency and compliance with regulatory requirements. MOBACT's Solpoint is the ideal choice of Septoint equipment for telemetry and remote monitoring, offering uninterrupted operation, security and flexibility.

solpoint setpoint

Absolute Compatibility with EFACEC SCADA of HEDNO

Solpoint is one of the few Setpoint RTUs that ensures full bidirectional compatibility with HEDNO’s EFACEC SCADA, enabling accurate and seamless data exchange. This means that energy facility managers can integrate Solpoint into their existing system without additional modifications or additions. Full interoperability with HEDNO’s infrastructure makes Solpoint a top choice for businesses seeking a reliable and direct connection to the distribution network.

δεδδηε approved setpoint

Proven solution in Greece for over 10 years

Solpoint has proven its reliability through more than 10 years of successful operation in Greece. Unlike newly introduced solutions, Solpoint has already been installed and operating in dozens of energy facilities, demonstrating its durability and efficiency. Its long-term success is a guarantee of its performance and stability, offering its users the confidence that they are investing in a Setpoint solution that has proven its value in practice.

SOLPOINT INDUSTRIAL PC

Reliable Setpoint Software with future-proofing

Solpoint features advanced and continuously upgraded software, designed to meet not only current but also future market demands. MOBACT continuously invests in improving the Setpoint system, ensuring that Solpoint remains compatible with technological developments and new regulatory requirements. Administrators can be confident that Solpoint software will remain up-to-date and efficient, eliminating the need for future replacements or costly upgrades.

setpoint mobact

Setpoint Equipment Selection – Why choose Solpoint?

MOBACT's Solpoint is not just an RTU telemetry unit. It is a complete solution that ensures:

  • Absolute Compatibility with HEDNO's EFACEC SCADA, ensuring uninterrupted communication with the network.
  • Proven Reliability, with more than 10 years of proven operation in the Greek market.
  • Flexibility and Future Compatibility, through a dynamic and constantly evolving software.
  • Security and Stability, with advanced protection measures against cyberattacks.
  • Easy Installation and Use, with a user-friendly interface and plug-and-play functionality.

MOBACT – Pioneer in Automation Solutions

MOBACT has been operating in the energy and construction sectors since 2005, offering high-quality integrated automation solutions. MOBACT Energy specializes in providing advanced automation solutions in the following areas:

  • Industrial automation: We provide systems that increase the productivity and flexibility of industrial production.
  • Electrical panels: We undertake the construction and installation of electrical panels that guarantee the safe and uninterrupted operation of industrial facilities.
  • IoT and Telematics management: The Internet of Things (IoT) technologies and telematics applications we offer enable efficient management in production units, improving process monitoring and control.

With Solpoint, MOBACT brings the next generation of telemetry to energy facilities, allowing operators to monitor, manage and improve the performance of their systems with the utmost accuracy and security. If you are looking for a reliable and innovative telemetry solution, Solpoint is the ultimate choice.

Setpoint method for cuts by HEDNO

Article 111 of Law 5106/2024 (Government Gazette 63/A/01.05.2024) introduces the obligation to install remote monitoring and remote management systems for Renewable Energy Sources (RES) and High Efficiency Cogeneration (HEPP) plants with an installed capacity of more than 400 kW. According to paragraph 4 of this article, the owners of these plants must install the systems within six months.