iDIG Verticality Control for Arida – Karagiorgos, Ptolemaida

First installation of iDig system for water level control in Greece

MOBACT continues to innovate in the construction sector, carrying out the first installation of iDig system for vertical control on a standard excavator in GreeceThe installation was carried out on the excavator of the company Karagiorgos Excavations, which is carrying out works for the construction of TERNA's photovoltaic park in Ptolemaida. This is an innovative solution that ensures maximum precision and productivity during the drilling and driving of piles.

αρίδα idig

The company Karagiorgos Earthmoving

The company Karagiorgos Earthmoving, based in Agrinio, operates in the field of earthmoving and technical works, providing integrated solutions to private and public projects. With many years of experience and modern equipment, the company ensures high quality services in excavations, land formations, road and infrastructure construction. Its commitment to innovation and the use of advanced technologies, such as the iDig system, confirms its position as a reliable partner in the construction industry.

καραγιώργος χωματουργικά

The importance of proper vertical control for arida

In large-scale projects, such as the construction of photovoltaic parks, accurate pile placement is a decisive factor for the success of the project. The slightest deviation in the verticality of the pile can lead to incorrect pile placement, requiring additional corrective actions (rework), which increases costs and delays the project. The iDig system comes to solve this problem, ensuring that each drilling starts with absolute precision in verticality, ensuring excellent results in pile driving.

καραγιώργος αρίδα

The unique advantages of the iDig system in Arida

The installation of iDig on the excavator boom of Karagiorgos Excavators brought immediate and measurable benefits in productivity and accuracy of work. Some of the key advantages of the solution include:

  • Absolute verticality from the beginning of drilling: iDig allows the operator to start drilling with an accurate vertical axis, ensuring that the pile will be placed correctly without deviations.
  • Elimination of rework: In traditional methods, deviations in verticality often require corrective actions, which cost time and money. With iDig, this problem is eliminated, reducing delays and increasing project efficiency.
  • Easy to use and quick to learn: The system is operator-friendly, with a simple and understandable interface that allows easy adaptation to site conditions.
  • Increased productivity: With iDig, the pile drilling and driving process is performed faster and more efficiently, ensuring higher productivity in a shorter period of time.
  • Reduction of human error: The operator receives immediate visual and audio guidance, preventing errors and ensuring that each drilling is performed with the greatest possible precision.
mobact αρίδα

The future of technology in construction

The installation of iDig at the Karagiorgos Excavation plant in Ptolemaida marks a new era in the way earthmoving operations are carried out. The adoption of innovative technologies such as iDig contributes to reducing costs, increasing efficiency and improving the quality of construction projects in Greece.

MOBACT, as a pioneer in the field of control and automation systems in construction, continues to offer cutting-edge solutions that change the data in the industry. With the first installation of iDig for pile height control in Greece, the way is opened for the optimization of earthworks and the establishment of new standards of quality and accuracy.

mobact φωτοβολταϊκά

For more information about iDig and its applications, visit our website www.mobact.gr or contact us to learn how you can benefit from the most advanced technological solutions in the construction industry.